{"id":2673,"date":"2018-11-29T14:54:58","date_gmt":"2018-11-29T12:54:58","guid":{"rendered":"https:\/\/vertia.fi\/?p=2673"},"modified":"2021-10-29T11:46:59","modified_gmt":"2021-10-29T08:46:59","slug":"monitoring-environmental-conditions-ensures-that-the-concrete-dries-properly","status":"publish","type":"post","link":"https:\/\/vertia.fi\/en\/blogi\/olosuhdeseuranta-mahdollistaa-betonin-kuivumisen-ajallaan\/","title":{"rendered":"Monitoring environmental conditions ensures that the concrete dries properly"},"content":{"rendered":"<p><img loading=\"lazy\" decoding=\"async\" class=\"alignnone size-large wp-image-2676\" src=\"https:\/\/vertia.fi\/wp-content\/uploads\/2018\/11\/olosuhdeseuranta-1024x678.jpg\" alt=\"\" width=\"640\" height=\"424\" srcset=\"https:\/\/vertia.fi\/wp-content\/uploads\/2018\/11\/olosuhdeseuranta-1024x678.jpg 1024w, https:\/\/vertia.fi\/wp-content\/uploads\/2018\/11\/olosuhdeseuranta-300x199.jpg 300w, https:\/\/vertia.fi\/wp-content\/uploads\/2018\/11\/olosuhdeseuranta-768x508.jpg 768w\" sizes=\"auto, (max-width: 640px) 100vw, 640px\" \/><\/p>\n<p><span style=\"font-weight: 400;\">Delays in concrete curing are one of the main reasons why construction sites fall behind schedule. To avoid delays during the finishing phase, it is essential to begin actively creating optimal curing conditions as soon as the building\u2019s exterior envelope is complete. A new addition to quality assurance measurements on construction sites is the monitoring of indoor air conditions using remotely readable equipment. Today, the client of a construction project or the moisture control plan may also require the monitoring and documentation of conditions during construction. Perhaps most importantly, however, monitoring conditions ensures good drying conditions for the concrete and helps avoid delays.<\/span><\/p>\n<p><span style=\"font-weight: 400;\">In practice <a href=\"https:\/\/vertia.fi\/en\/environmental-monitoring\/\">environmental monitoring<\/a> This means that equipment is installed on-site to measure indoor air temperature and relative humidity and transmit the data wirelessly to a cloud service. You can view the data on your laptop or via a mobile app. Using the software, the measurement data can be visualized as graphs and weekly averages, among other things.<\/span><\/p>\n<p><span style=\"font-weight: 400;\">The monitoring devices are small, and the model we use resembles an electrical junction box. Thanks to advanced batteries, a single device can collect data continuously for over three years, depending on the measurement interval.<\/span><\/p>\n<p><span style=\"font-weight: 400;\">Thanks to remote monitoring, tracking site conditions is easy and significantly more reliable than manual measurements. The equipment takes readings at regular intervals, such as every half hour. This provides measurement data 48 times a day from each device, allowing for an accurate assessment of whether site conditions support the drying of structures and the current work phases. In skilled hands, this monitoring enables timely intervention to address problems. Even years later, measurement data and site logs can be used to verify the conditions under which the work was performed.<\/span><\/p>\n<p><span style=\"font-weight: 400;\">The biggest challenges on a construction site are signal coverage and damage to sensitive equipment. Signal coverage can be improved by repositioning equipment or installing additional base stations. Damage can be prevented through better placement, labeling, protection, and by informing installers of the equipment\u2019s presence. In practice, however, some equipment loss still occurs.<\/span><\/p>\n<p><span style=\"font-weight: 400;\">By monitoring indoor air conditions, we can continuously determine whether the drying conditions at the construction site are adequate and take corrective action as needed. The equipment\u2019s measurement data also shows whether the measures taken have been effective and whether they are appropriately scaled.<\/span><\/p>","protected":false},"excerpt":{"rendered":"<p>A new addition to quality assurance measurements at construction sites is the monitoring of indoor air conditions using remotely readable equipment.<\/p>","protected":false},"author":8,"featured_media":2676,"comment_status":"closed","ping_status":"open","sticky":false,"template":"","format":"standard","meta":{"_acf_changed":false,"footnotes":""},"categories":[10,6],"tags":[],"class_list":["post-2673","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-asiantuntijablogi","category-blogi"],"acf":[],"yoast_head":"<!-- This site is optimized with the Yoast SEO plugin v27.9 - https:\/\/yoast.com\/product\/yoast-seo-wordpress\/ -->\n<title>Olosuhdeseuranta mahdollistaa betonin kuivumisen ajallaan | Vertia.fi<\/title>\n<meta name=\"description\" content=\"Viiv\u00e4stykset betonin kuivumisessa ovat yksi syist\u00e4 sille, ettei ty\u00f6maa pysy aikataulussa. Et\u00e4seurannan ansiosta ty\u00f6maan olosuhteiden seuranta on helppoa.\" \/>\n<meta name=\"robots\" content=\"index, follow, max-snippet:-1, max-image-preview:large, max-video-preview:-1\" \/>\n<link rel=\"canonical\" href=\"https:\/\/vertia.fi\/en\/blog\/monitoring-environmental-conditions-ensures-that-the-concrete-dries-properly\/\" \/>\n<meta property=\"og:locale\" content=\"en_GB\" \/>\n<meta property=\"og:type\" content=\"article\" \/>\n<meta property=\"og:title\" content=\"Olosuhdeseuranta mahdollistaa betonin kuivumisen ajallaan | Vertia.fi\" \/>\n<meta property=\"og:description\" content=\"Viiv\u00e4stykset betonin kuivumisessa ovat yksi syist\u00e4 sille, ettei ty\u00f6maa pysy aikataulussa. Et\u00e4seurannan ansiosta ty\u00f6maan olosuhteiden seuranta on helppoa.\" \/>\n<meta property=\"og:url\" content=\"https:\/\/vertia.fi\/en\/blog\/monitoring-environmental-conditions-ensures-that-the-concrete-dries-properly\/\" \/>\n<meta property=\"og:site_name\" content=\"Vertia.fi\" \/>\n<meta property=\"article:published_time\" content=\"2018-11-29T12:54:58+00:00\" \/>\n<meta property=\"article:modified_time\" content=\"2021-10-29T08:46:59+00:00\" \/>\n<meta property=\"og:image\" content=\"https:\/\/vertia.fi\/wp-content\/uploads\/2018\/11\/olosuhdeseuranta.jpg\" \/>\n\t<meta property=\"og:image:width\" content=\"3000\" \/>\n\t<meta property=\"og:image:height\" content=\"1985\" \/>\n\t<meta property=\"og:image:type\" content=\"image\/jpeg\" \/>\n<meta name=\"author\" content=\"Vertia\" \/>\n<meta name=\"twitter:card\" content=\"summary_large_image\" \/>\n<meta name=\"twitter:label1\" content=\"Written by\" \/>\n\t<meta name=\"twitter:data1\" content=\"Vertia\" \/>\n\t<meta name=\"twitter:label2\" content=\"Est. reading time\" \/>\n\t<meta name=\"twitter:data2\" content=\"2 minutes\" \/>\n<script type=\"application\/ld+json\" class=\"yoast-schema-graph\">{\"@context\":\"https:\\\/\\\/schema.org\",\"@graph\":[{\"@type\":\"Article\",\"@id\":\"https:\\\/\\\/vertia.fi\\\/blogi\\\/olosuhdeseuranta-mahdollistaa-betonin-kuivumisen-ajallaan\\\/#article\",\"isPartOf\":{\"@id\":\"https:\\\/\\\/vertia.fi\\\/blogi\\\/olosuhdeseuranta-mahdollistaa-betonin-kuivumisen-ajallaan\\\/\"},\"author\":{\"name\":\"Vertia\",\"@id\":\"https:\\\/\\\/vertia.fi\\\/#\\\/schema\\\/person\\\/20ff6ac9aefef7c4969d22e7e755aabd\"},\"headline\":\"Olosuhdeseuranta mahdollistaa betonin kuivumisen ajallaan\",\"datePublished\":\"2018-11-29T12:54:58+00:00\",\"dateModified\":\"2021-10-29T08:46:59+00:00\",\"mainEntityOfPage\":{\"@id\":\"https:\\\/\\\/vertia.fi\\\/blogi\\\/olosuhdeseuranta-mahdollistaa-betonin-kuivumisen-ajallaan\\\/\"},\"wordCount\":339,\"image\":{\"@id\":\"https:\\\/\\\/vertia.fi\\\/blogi\\\/olosuhdeseuranta-mahdollistaa-betonin-kuivumisen-ajallaan\\\/#primaryimage\"},\"thumbnailUrl\":\"https:\\\/\\\/vertia.fi\\\/wp-content\\\/uploads\\\/2018\\\/11\\\/olosuhdeseuranta.jpg\",\"articleSection\":[\"Asiantuntijablogi\",\"Blogi\"],\"inLanguage\":\"en-GB\"},{\"@type\":\"WebPage\",\"@id\":\"https:\\\/\\\/vertia.fi\\\/en\\\/blogi\\\/olosuhdeseuranta-mahdollistaa-betonin-kuivumisen-ajallaan\\\/\",\"url\":\"https:\\\/\\\/vertia.fi\\\/en\\\/blogi\\\/olosuhdeseuranta-mahdollistaa-betonin-kuivumisen-ajallaan\\\/\",\"name\":\"Olosuhdeseuranta mahdollistaa betonin kuivumisen ajallaan | Vertia.fi\",\"isPartOf\":{\"@id\":\"https:\\\/\\\/vertia.fi\\\/#website\"},\"primaryImageOfPage\":{\"@id\":\"https:\\\/\\\/vertia.fi\\\/blogi\\\/olosuhdeseuranta-mahdollistaa-betonin-kuivumisen-ajallaan\\\/#primaryimage\"},\"image\":{\"@id\":\"https:\\\/\\\/vertia.fi\\\/blogi\\\/olosuhdeseuranta-mahdollistaa-betonin-kuivumisen-ajallaan\\\/#primaryimage\"},\"thumbnailUrl\":\"https:\\\/\\\/vertia.fi\\\/wp-content\\\/uploads\\\/2018\\\/11\\\/olosuhdeseuranta.jpg\",\"datePublished\":\"2018-11-29T12:54:58+00:00\",\"dateModified\":\"2021-10-29T08:46:59+00:00\",\"author\":{\"@id\":\"https:\\\/\\\/vertia.fi\\\/#\\\/schema\\\/person\\\/20ff6ac9aefef7c4969d22e7e755aabd\"},\"description\":\"Viiv\u00e4stykset betonin kuivumisessa ovat yksi syist\u00e4 sille, ettei ty\u00f6maa pysy aikataulussa. Et\u00e4seurannan ansiosta ty\u00f6maan olosuhteiden seuranta on helppoa.\",\"breadcrumb\":{\"@id\":\"https:\\\/\\\/vertia.fi\\\/blogi\\\/olosuhdeseuranta-mahdollistaa-betonin-kuivumisen-ajallaan\\\/#breadcrumb\"},\"inLanguage\":\"en-GB\",\"potentialAction\":[{\"@type\":\"ReadAction\",\"target\":[\"https:\\\/\\\/vertia.fi\\\/blogi\\\/olosuhdeseuranta-mahdollistaa-betonin-kuivumisen-ajallaan\\\/\"]}]},{\"@type\":\"ImageObject\",\"inLanguage\":\"en-GB\",\"@id\":\"https:\\\/\\\/vertia.fi\\\/blogi\\\/olosuhdeseuranta-mahdollistaa-betonin-kuivumisen-ajallaan\\\/#primaryimage\",\"url\":\"https:\\\/\\\/vertia.fi\\\/wp-content\\\/uploads\\\/2018\\\/11\\\/olosuhdeseuranta.jpg\",\"contentUrl\":\"https:\\\/\\\/vertia.fi\\\/wp-content\\\/uploads\\\/2018\\\/11\\\/olosuhdeseuranta.jpg\",\"width\":3000,\"height\":1985},{\"@type\":\"BreadcrumbList\",\"@id\":\"https:\\\/\\\/vertia.fi\\\/blogi\\\/olosuhdeseuranta-mahdollistaa-betonin-kuivumisen-ajallaan\\\/#breadcrumb\",\"itemListElement\":[{\"@type\":\"ListItem\",\"position\":1,\"name\":\"Etusivu\",\"item\":\"https:\\\/\\\/vertia.fi\\\/\"},{\"@type\":\"ListItem\",\"position\":2,\"name\":\"Olosuhdeseuranta mahdollistaa betonin kuivumisen ajallaan\"}]},{\"@type\":\"WebSite\",\"@id\":\"https:\\\/\\\/vertia.fi\\\/#website\",\"url\":\"https:\\\/\\\/vertia.fi\\\/\",\"name\":\"Vertia.fi\",\"description\":\"Asumisen laadun varmistaja\",\"potentialAction\":[{\"@type\":\"SearchAction\",\"target\":{\"@type\":\"EntryPoint\",\"urlTemplate\":\"https:\\\/\\\/vertia.fi\\\/?s={search_term_string}\"},\"query-input\":{\"@type\":\"PropertyValueSpecification\",\"valueRequired\":true,\"valueName\":\"search_term_string\"}}],\"inLanguage\":\"en-GB\"},{\"@type\":\"Person\",\"@id\":\"https:\\\/\\\/vertia.fi\\\/#\\\/schema\\\/person\\\/20ff6ac9aefef7c4969d22e7e755aabd\",\"name\":\"Vertia\",\"image\":{\"@type\":\"ImageObject\",\"inLanguage\":\"en-GB\",\"@id\":\"https:\\\/\\\/vertia.fi\\\/wp-content\\\/uploads\\\/2022\\\/04\\\/liikemerkki-96x96.jpg\",\"url\":\"https:\\\/\\\/vertia.fi\\\/wp-content\\\/uploads\\\/2022\\\/04\\\/liikemerkki-96x96.jpg\",\"contentUrl\":\"https:\\\/\\\/vertia.fi\\\/wp-content\\\/uploads\\\/2022\\\/04\\\/liikemerkki-96x96.jpg\",\"caption\":\"Vertia\"},\"description\":\"Vertia on asumisen laadun varmistaja. Teht\u00e4v\u00e4mme on parantaa rakentamisen laatua. Ta\u00advoit\u00adtee\u00adnam\u00adme on, et\u00adt\u00e4 jo\u00adkai\u00adnen Suo\u00admes\u00adsa voi\u00adsi asua ter\u00advees\u00ads\u00e4, ener\u00adgia\u00adte\u00adhok\u00adkaas\u00adsa ja viih\u00adtyi\u00ads\u00e4s\u00ads\u00e4 ko\u00addis\u00adsa.\"}]}<\/script>\n<!-- \/ Yoast SEO plugin. -->","yoast_head_json":{"title":"Condition monitoring ensures concrete dries properly | Vertia.fi","description":"Delays in concrete curing are one of the reasons why construction sites fall behind schedule. Remote monitoring makes it easy to keep track of site conditions.","robots":{"index":"index","follow":"follow","max-snippet":"max-snippet:-1","max-image-preview":"max-image-preview:large","max-video-preview":"max-video-preview:-1"},"canonical":"https:\/\/vertia.fi\/en\/blog\/monitoring-environmental-conditions-ensures-that-the-concrete-dries-properly\/","og_locale":"en_GB","og_type":"article","og_title":"Olosuhdeseuranta mahdollistaa betonin kuivumisen ajallaan | Vertia.fi","og_description":"Viiv\u00e4stykset betonin kuivumisessa ovat yksi syist\u00e4 sille, ettei ty\u00f6maa pysy aikataulussa. Et\u00e4seurannan ansiosta ty\u00f6maan olosuhteiden seuranta on helppoa.","og_url":"https:\/\/vertia.fi\/en\/blog\/monitoring-environmental-conditions-ensures-that-the-concrete-dries-properly\/","og_site_name":"Vertia.fi","article_published_time":"2018-11-29T12:54:58+00:00","article_modified_time":"2021-10-29T08:46:59+00:00","og_image":[{"width":3000,"height":1985,"url":"https:\/\/vertia.fi\/wp-content\/uploads\/2018\/11\/olosuhdeseuranta.jpg","type":"image\/jpeg"}],"author":"Vertia","twitter_card":"summary_large_image","twitter_misc":{"Written by":"Vertia","Est. reading time":"2 minutes"},"schema":{"@context":"https:\/\/schema.org","@graph":[{"@type":"Article","@id":"https:\/\/vertia.fi\/blogi\/olosuhdeseuranta-mahdollistaa-betonin-kuivumisen-ajallaan\/#article","isPartOf":{"@id":"https:\/\/vertia.fi\/blogi\/olosuhdeseuranta-mahdollistaa-betonin-kuivumisen-ajallaan\/"},"author":{"name":"Vertia","@id":"https:\/\/vertia.fi\/#\/schema\/person\/20ff6ac9aefef7c4969d22e7e755aabd"},"headline":"Olosuhdeseuranta mahdollistaa betonin kuivumisen ajallaan","datePublished":"2018-11-29T12:54:58+00:00","dateModified":"2021-10-29T08:46:59+00:00","mainEntityOfPage":{"@id":"https:\/\/vertia.fi\/blogi\/olosuhdeseuranta-mahdollistaa-betonin-kuivumisen-ajallaan\/"},"wordCount":339,"image":{"@id":"https:\/\/vertia.fi\/blogi\/olosuhdeseuranta-mahdollistaa-betonin-kuivumisen-ajallaan\/#primaryimage"},"thumbnailUrl":"https:\/\/vertia.fi\/wp-content\/uploads\/2018\/11\/olosuhdeseuranta.jpg","articleSection":["Asiantuntijablogi","Blogi"],"inLanguage":"en-GB"},{"@type":"WebPage","@id":"https:\/\/vertia.fi\/en\/blogi\/olosuhdeseuranta-mahdollistaa-betonin-kuivumisen-ajallaan\/","url":"https:\/\/vertia.fi\/en\/blogi\/olosuhdeseuranta-mahdollistaa-betonin-kuivumisen-ajallaan\/","name":"Condition monitoring ensures concrete dries properly | Vertia.fi","isPartOf":{"@id":"https:\/\/vertia.fi\/#website"},"primaryImageOfPage":{"@id":"https:\/\/vertia.fi\/blogi\/olosuhdeseuranta-mahdollistaa-betonin-kuivumisen-ajallaan\/#primaryimage"},"image":{"@id":"https:\/\/vertia.fi\/blogi\/olosuhdeseuranta-mahdollistaa-betonin-kuivumisen-ajallaan\/#primaryimage"},"thumbnailUrl":"https:\/\/vertia.fi\/wp-content\/uploads\/2018\/11\/olosuhdeseuranta.jpg","datePublished":"2018-11-29T12:54:58+00:00","dateModified":"2021-10-29T08:46:59+00:00","author":{"@id":"https:\/\/vertia.fi\/#\/schema\/person\/20ff6ac9aefef7c4969d22e7e755aabd"},"description":"Delays in concrete curing are one of the reasons why construction sites fall behind schedule. Remote monitoring makes it easy to keep track of site conditions.","breadcrumb":{"@id":"https:\/\/vertia.fi\/blogi\/olosuhdeseuranta-mahdollistaa-betonin-kuivumisen-ajallaan\/#breadcrumb"},"inLanguage":"en-GB","potentialAction":[{"@type":"ReadAction","target":["https:\/\/vertia.fi\/blogi\/olosuhdeseuranta-mahdollistaa-betonin-kuivumisen-ajallaan\/"]}]},{"@type":"ImageObject","inLanguage":"en-GB","@id":"https:\/\/vertia.fi\/blogi\/olosuhdeseuranta-mahdollistaa-betonin-kuivumisen-ajallaan\/#primaryimage","url":"https:\/\/vertia.fi\/wp-content\/uploads\/2018\/11\/olosuhdeseuranta.jpg","contentUrl":"https:\/\/vertia.fi\/wp-content\/uploads\/2018\/11\/olosuhdeseuranta.jpg","width":3000,"height":1985},{"@type":"BreadcrumbList","@id":"https:\/\/vertia.fi\/blogi\/olosuhdeseuranta-mahdollistaa-betonin-kuivumisen-ajallaan\/#breadcrumb","itemListElement":[{"@type":"ListItem","position":1,"name":"Etusivu","item":"https:\/\/vertia.fi\/"},{"@type":"ListItem","position":2,"name":"Olosuhdeseuranta mahdollistaa betonin kuivumisen ajallaan"}]},{"@type":"WebSite","@id":"https:\/\/vertia.fi\/#website","url":"https:\/\/vertia.fi\/","name":"Vertia.fi","description":"Ensuring Quality of Life","potentialAction":[{"@type":"SearchAction","target":{"@type":"EntryPoint","urlTemplate":"https:\/\/vertia.fi\/?s={search_term_string}"},"query-input":{"@type":"PropertyValueSpecification","valueRequired":true,"valueName":"search_term_string"}}],"inLanguage":"en-GB"},{"@type":"Person","@id":"https:\/\/vertia.fi\/#\/schema\/person\/20ff6ac9aefef7c4969d22e7e755aabd","name":"Vertia","image":{"@type":"ImageObject","inLanguage":"en-GB","@id":"https:\/\/vertia.fi\/wp-content\/uploads\/2022\/04\/liikemerkki-96x96.jpg","url":"https:\/\/vertia.fi\/wp-content\/uploads\/2022\/04\/liikemerkki-96x96.jpg","contentUrl":"https:\/\/vertia.fi\/wp-content\/uploads\/2022\/04\/liikemerkki-96x96.jpg","caption":"Vertia"},"description":"Vertia ensures high-quality housing. Our mission is to improve the quality of construction. Our goal is for everyone in Finland to be able to live in a healthy, energy-efficient, and comfortable home."}]}},"_links":{"self":[{"href":"https:\/\/vertia.fi\/en\/wp-json\/wp\/v2\/posts\/2673","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/vertia.fi\/en\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/vertia.fi\/en\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/vertia.fi\/en\/wp-json\/wp\/v2\/users\/8"}],"replies":[{"embeddable":true,"href":"https:\/\/vertia.fi\/en\/wp-json\/wp\/v2\/comments?post=2673"}],"version-history":[{"count":7,"href":"https:\/\/vertia.fi\/en\/wp-json\/wp\/v2\/posts\/2673\/revisions"}],"predecessor-version":[{"id":4596,"href":"https:\/\/vertia.fi\/en\/wp-json\/wp\/v2\/posts\/2673\/revisions\/4596"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/vertia.fi\/en\/wp-json\/wp\/v2\/media\/2676"}],"wp:attachment":[{"href":"https:\/\/vertia.fi\/en\/wp-json\/wp\/v2\/media?parent=2673"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/vertia.fi\/en\/wp-json\/wp\/v2\/categories?post=2673"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/vertia.fi\/en\/wp-json\/wp\/v2\/tags?post=2673"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}